Showing posts with label shedir baby hat. Show all posts
Showing posts with label shedir baby hat. Show all posts

Wednesday, November 21, 2007

It's been too long

First a clerical issue... The response I posted below was not my own, but someone who had commented on Debbie's blog post. I simply agreed with what he had to say. Thanks for all the comments, it's good to know there are people out there with their head on straight. :) Enough of that, it's been up too long. Back to knitting.

I've picked up progress on the Garter-Rib Socks. It kind of puts me back on deadline to get these done by the end of November, which was the reason I gave up on the SAMKAL4, but I think now that I'm past the heel, I can just finish them up and be done. I won't be able to wear them to Thanksgiving, but I definitely plan on wearing them for Christmas (it's one day before Thanksgiving, I suppose it's alright to mention the C-word).

I've also started adding the black lines to my Rock 'n' Roll Argyle Socks using duplicate stitch. Holy crap these are a lot of work. All the intarsia was bad enough, but I left most of the ends unwoven because I couldn't tolerate weaving them in when I was done. When I started the duplicate stitch, I was catching a lot of the ends with my needle, so I had to stop and weave all the ends in before I could continue. I'm almost done with one sock, but I'm afraid SSS is going to creep in again before I can start the other. Who knew you could get SSS twice on one pair of socks?!

The Baby Shedir is finished, it just needs to be blocked and photographed. Speaking of, there's practically no good photography light anymore. I really hate winter. I know as a knitter I should love it because I get to more easily wear hand knits, but I'm not at a stage where I can whip out a sweater in 2-3 weeks and I don't have one already done, so it doesn't really do much for me.

If you've scrolled down past my most recent entry in the past week or so, you've probably noticed some lovely progress bars. I was lucky enough to get in as a Ravelry tester for this particular feature. It pulls the progress on your project straight from Ravlery, so you don't have to update it in more than one place. Pretty neat. So far, I've learned two things: 1. I have a lot of projects that are in the home stretch and I really should finish them up. 2. I need to start some new projects! I'm just not sure what yet.

After finishing the Baby Shedir and Aww Knucks! I realized that other than one ball of Wool of the Andes, all I have is sock yarn. I do plan on knitting at least one more pair of socks for December, but otherwise, I'm not really into knitting socks right now. I really want to use some heavier weight yarn. But I'm on a self-imposed yarn diet until after Christmas. I did think about making the WOTA into a hat, but I'm not sure one skein is enough. I'll have to find a simple top down pattern.

I have been yarn shopping though. I want to make a brown cabled sweater with some worsted weight wool yarn, but I'm realizing that I know next to nothing about yarn other than KnitPicks. They were the first yarn supplier I bought yarn from since the price is right and I've been scared to take a chance on more expensive yarn. I really like the look of tweed yarns, so I've been browsing WEBS for good deals.

Monday, November 5, 2007

I've Been Busy

So I haven't blogged in over two weeks. So what? I've been busy knitting, and that's really the point isn't it? I've finished the Fibonacci Ribs sweater, it just needs to be blocked, modeled and photographed. So I should have that done in another year or two. :-) The other good thing about finishing the sweater? Leftover yarn! I ended up with two whole skeins of Asparagus Merino Style left, and so I knit the following over the last two weeks:

Aww Knucks!
knucks

Pattern: Knucks from Knitty.com
Yarn: Knit Picks' Merino Style in the Asparagus colorway, 1.2 skeins (approx.)
Needles: Bamboo DPNs size 4 & 3, Knit Picks options size 4
Started: October 22
Finished: November 2
Modifications: Made the fingers longer, magic loop instead of DPNs - much easier

These were a quick and easy project, only took me a week to complete. Love that instant gratification! Don't mind the color, it's really a lot brighter green. That's what I get for indoor photos at midnight. I'll be making more of these, hopefully refining the design along the way, they're a little loose after the thumb gusset. I started the textured cuff and I liked it, but I couldn't complete the crab stitch edging since I couldn't find the right size crochet needle. I frogged and worked a ribbed cuff with smaller needles. I'd like to unvent a cuff up (?) version that eliminates the gaps between the fingers. Still haven't come up with anything to embroider on the knuckles yet (P*SS OFF!, F*CK OFF!... I'm an angry driver :-) ), suggestions are welcome. My wife asked for a pair, but she wants a different color, so you know what that means...yarn shopping!

Baby Shedir
baby shedir

This is the Shedir pattern from Knitty using the modifications found here. I got the idea from Ravelry after browsing other patterns knit with Merino Style for ideas. Again with the color... I started it on Saturday to have something to work on during the Michigan vs. Michigan State game, Go Blue! I know, wrong color, but it didn't jinx the team. I've knit this pattern before and it's just as enjoyable this time around, even more so working on two circs instead of DPNs. I have to say, even thought it's my first, I LOVE knitting baby items. They're so quick! I'll definitely be making more of these in the future both for us (we're all talk for now) and for friends that are expecting.

Not much else to report on in the knitting world, Ravelry still consumes much of my internet time (more than it should), and the October (now November) garter-rib socks get a row longer here and there. I'm just not feeling the tiny needles right now. (Maybe it's the DPNs?) And I decided I'm not totally giving up on the SAMKAL4, just skipping October. I figure I have one pair 65% done, I can finish those sometime this month, then have a month and a half to knit a December pair. Four out of five isn't bad in my book.

P.S. - Had to do a little surgery on one of my Options needles. The end came off the cord - cleanly, not broken - and I used super glue to reattach. I must've waited too long after applying the glue though, the cord wouldn't go all the way back in. It's usable and it doesn't snag yarn, but I'm not happy about it.