So I picked this sock back up after it lying dormant for over a year after finally finishing off my pair of green socks. I initially started to knit the established pattern, but quickly realized all the reasons I put it down in the first place: dark yarn, small stitches and mock cables were not making for a very enjoyable knit.
I decided to throw caution to the wind and simply continue on with a 4x2 ribbing pattern. (The switch happens about halfway up the leg, so not a normal starting position for the ribbing at the top of a sock.) I really like how it's turning out, both the fabric of the sock and how the yarn is pooling. I told myself that I wouldn't care about where the ribbing started and that I'd even knit the second sock in all 4x2 ribbing and not care that they will be fraternal twins.
I like the pattern I'm knitting now so much that I'm wondering if I should rip out the mock cables and make a pair of socks that I'll really like instead of a pair I'll just tolerate. The problem is I know that if I rip this sock out, there's a very slim chance that I'll actually restart it instead of knitting some other more fascinating project. However, I do hold the slim hope that if I finish this sock as is, then knit the second how I now want to, that it may give me the push to "fix" the first sock.
So what do I do?
A) Continue knitting sock #1 as is, knit sock #2 in 4x2 rib and hope it inspires me to reknit #1?
B) Frog sock #1 immediately and try to restart in 4x2 rib knowing that I may abandon the project completely?
Conundrum.
Monday, August 15, 2011
Conundrum
Wednesday, May 25, 2011
Howzabout a WIP Wednesday?

I started another Baby Surprise Jacket this past weekend. It's knit in Sock That Rock Mediumweight, Monsoon, which has been languishing in my stash waiting for the perfect project. I started two other projects with it only to end up with pooling I didn't quite like. The miters on the BSJ take care of that problem nicely.
I'm using size 4 needles which, combined with the medium weight STR, should make for a bit larger sweater than the last fingering weight BSJ I knit. (Speaking of, that sweater lost a battle with velcro in the washing machine. Unfortunately, superwash doesn't mean completely indestructible. I'm hoping a handwash and careful blocking will return things to normal.)
It's resting gently in one of my office desk drawers at the moment where I can grab it for a few quick, sneaky rows in between work. Lately it's been very slow in the office so I've grown bolder with sneaking in a few stitches. Thankfully my office is tucked away in a corner and it's been fairly quiet, so I can hear people approach.
Thursday, May 12, 2011
Wednesday, May 4, 2011
For Mojo

C'mon Red Wings. Let's do this.
This is what we brought E home in (over a month ago!). I knit it in about a week. It's a top-down raglan sweater with no shaping whatsoever, therefore the front of the collar sits a bit high. I did insert a placket on the left shoulder to make it easier to get on. I then sewed two or three snaps in to close it. I had initially intended to put buttons on, but snaps are SO much easier to manage on a squirming baby. And boy does he squirm.
I knit the logo across the chest as I went after I initially planned to use duplicate stitch. If I recall correctly, I was feeling pressed for time and thought this would be faster. I'm glad I did it this way, I think it looks better. To manage it in the round, I cut long lengths of the white yarn and started the first row in the middle of that length of yarn. I then had approximately the same length left waiting for me when I came around for the next row. Lather, rinse, repeat.
It ended up being a tad long, but hopefully that means he can wear it again when hockey resumes this fall. He's little guy, but he's also gaining weight quickly. If he outgrows it, I'll be knitting another one.
Wednesday, April 27, 2011
For the Birds

I'm exhausted from lack of sleep, so I'm not feeling terribly creative with the words today. I was able to knock this guy out over the weekend though. Which may have started an obsession with knitting all of the Angry Birds patterns and amigurumi in general. I envision live action Angry Birds. Unfortunately, with my self-imposed embargo on yarn purchases for 2011, I'm going to have to scavenge for the proper colored acrylic yarn.
One last things before I collapse into a coma at my desk: This little guy is weighted down with a custom made bean bag. Those are real beans in there.

If you're interested in materials, the fabric was left over from our bedroom curtains and is stitched together with an oddment of *gasp* Wollmeise. The beans are red. I may have overestimated the weight as the bird acts like a freaking Weeble. I fear for anyone that crosses its angry flight path.
P.S. If anyone has any Red Heart yarn they're looking to get rid of, I could use some in the following colors: Bright Yellow #0324, Spring Green #672, Delft Blue #0885
Thursday, March 10, 2011
Brevity is the soul of wit
In what is barely more than a Flickr repost, I bring you progress on my latest knitting conquest.

I had grand intentions of finishing these by St. Patrick's Day, but seeing as how that is merely a week away, it's not going to happen. Though I have finished this first one and cast on for the second. It's not SSS this time, I just have to finish something else on a deadline, hopefully only a few weeks away. I'd tell you about it now, but let's save that for another blog post, shall we?











Hint the first: It's not finished (though it is now)
Hint the second: It will live outside (as things of this sort usually do)
Hint the third: There's another color to be added (you can see a bit of it peeking)